Results 1 to 4 of 4

Thread: Amanda Overwrite on the Tape

  1. #1

    Exclamation Amanda Overwrite on the Tape

    Hello

    I am New to Amanda, While working with amanda found that Amanda is overwriting on the tape which is the biggest drawback for me cause I am using tape library, and one tape haping capacity of 6.25 TB and my Full backup is of 1 TB, How can I maintain it week wise so that I have every week data with me as a full backup so that if want to restore my data from the full backup of 3 years back of a very specific date made possible.

    please guide me on this.

    Thanks

  2. #2
    Join Date
    Mar 2015
    Posts
    2

    Default

    Same problem is being faced by me on ver 2.6.1p2. Please guide .. needs urgent support!!

    date host disk lv tape or file file part status
    2015-04-04 16:13:31 gspc-cloud2 /mnt 1 mar-14 1 1/1 OK
    2015-04-05 02:00:01 gspc-cloud2 /mnt 2 mar-15 1 1/1 OK
    2015-04-06 02:00:02 gspc-cloud2 /mnt 2 mar-16 1 1/1 OK


    Also guide about how to distinguish which number of incremental level is written?

  3. #3
    Join Date
    Nov 2005
    Location
    Canada
    Posts
    1,046

    Default

    Amanda can't append multiple run to the same tape?

    The only you can do is do the backup to holding disk (require a 6.25 TB holding disk) and do an amflush every week.

  4. #4

    Default

    Can you try to strace the amidxtaped, or attach a debugger to it.

    Add a sleep at the beginning of the program to allow you enough time to attach strace or gdb.



    __________________
    ANAIM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •